INDUSTRIAL WAREHOUSE MAINTENANCE

PLACE: TIJUANA, BC. WE PERFORMED A ROUTINE MAINTENANCE SERVICE FOR ONE OF OUR CLIENTS IN TIJUANA, TAKING ATTENTION TO THE SUBSTATION OF ONE OF ITS INDUSTRIAL BUILDINGS, PERFORMING TESTS TO THE TRANSFORMERS, CLEANING AND READJUSTMENT OF COMPONENTS AND ACCESSORIES.

Continue reading

EL FLORIDO SUBSTATION

PLACE: EJIDO OJO DE AGUA, TIJUANA, BC. WE WERE PART OF THE MODERNIZATION PROJECT OF THE CFE EL FLORIDO SUBSTATION, IN TIJUANA B.C., OUR TEAM WAS IN CHARGE OF RECEIVING AND REVIEWING IN DETAIL A NEW TRANSFORMER OF 20MVA AND PRIMARY VOLTAGE OF 115KV, INSTALLING IT AND LEAVING IT IN OPTIMAL CONDITIONS FOR ITS CORRECT OPERATION PERFORMING VARIOUS TESTS LIKE; POWER FACTOR, WINDING RESISTANCE, EXCITATION CURRENT, OIL TESTS, RESISTIVITY, CHROMATOGRAPHY, AMONG OTHERS.

Continue reading

PENINSULA SQUARE

PLACE: TIJUANA, BC. WE WERE PART OF THE ELECTRICAL FACILITIES TEAM OF THE PLAZA PENINSULA IN TIJUANA, WE PERFORMED ALL THE PRELIMINARY WORKS TO ENERGIZE THE PLAZA, FROM THE INSTALLATION OF UNDERGROUND CONDUCTORS, TERMINALS, JUNCTION BOXES, CABLE ARRANGEMENT, EARTH SYSTEMS, AND OTHER ADJUSTMENTS.

Continue reading

PRADERAS DEL MAR

PLACE: ROSARITO, BC. IT CONSISTED OF A PROJECT FROM SCRATCH, WHERE WE ANALYZED, DESIGNED AND INSTALLED THE ELECTRICAL NETWORK ACCORDING TO THE NEEDS OF THE FRACTIONATION, IN THE SAME WAY WE CARRY OUT THE MANAGEMENT OF THE PROCESS WITH CFE FOR THE SUPPLY OF ENERGY, SUPERVISING THE PROCESS FROM THE BEGINNING TO THE CONNECTION BY THE FEDERAL ELECTRICITY COMMISSION.

Continue reading

LA BALLENA

PLACE: SAN JOSÉ DEL CABO, BCS. WE CARRY OUT ELECTRICAL WORKS IN THE PROPERTY KNOWN AS LA BALLENA. WE BUILT THE OVERHEAD LINE IN WHICH BETWEEN NEW AND EXISTING WORKS WERE INSTALLED MORE THAN 300 STRUCTURES ON POLES, MORE THAN 100 TRANSFORMERS AND 25KM OF CONDUCTOR TO ELECTRIFY AND REGULATE ENERGY IN THIS AREA OF SAN JOSÉ DEL CABO.

Continue reading

LINE + RECALIBRATION LORETO

PLACE: LORETO, BCS. WE BUILT THE OVERHEAD LINE IN SEVERAL COMMUNITIES IN THE MUNICIPALITY OF LORETO (CALLE SIERRA, CERRO SAN JUAN, CALLE B PROLONGATION, SANTA GERTRUDIS AND AQUEDUCT). THIS PROJECT HAD THE PURPOSE OF IMPROVING THE QUALITY AND LOSS OF ENERGY IN THE CITY, TO DO THIS WE INSTALLED 20 POLES, 5 TRANSFORMERS AND ONE KM OF CONDUCTOR OF DIFFERENT CALIBERS TO STABILIZE THE CIRCUITS OF THE CITY.

Continue reading

LORETO RECALIBRATION

PLACE: LORETO, BCS. WE CONDUCTED THE CONSTRUCTION OF THE OVERHEAD LINE AND RECALIBRATION OF THE EXISTING LINE OF THE LORETO SUBSTATION FOR THE 4135 AND 4155 CIRCUIT. THE NEED ARISEN TO IMPROVE TWO CIRCUITS OF THE SUBSTATION, FOR THIS WE PERFORMED THE RECALIBRATION OF TWO CIRCUITS OF THE SAME PATH. NEW POLES WERE INSERTED AND EXISTING ONES WERE RESTRUCTURED TO INSTALL 24KM OF NEW CONDUCTOR IN A DOUBLE CIRCUIT NETWORK TO COMBAT LOSSES AT THE SUBSTATION.

Continue reading

VIZCAINO LINE

PLACE: VIZCAINO, BCS.WE BUILT THE ELECTRICAL NETWORK FOR THE SAN JUAN PROPERTY IN THE CITY OF VIZCAÍNO. WE INSTALLED 40 WOODEN POLES OF 12M, 9 TRANSFORMERS AND 5KM OF CONDUCTOR TO SUPPLY ENERGY TO THE HOUSES OF THE SITE.

Continue reading

ENERGIZING MULEJÉ

PLACE: MULEJÉ, BCS. WE CARRY OUT THE CONSTRUCTION OF AIR LINES IN DIFFERENT COLONIES IN THE MULEJÉ MUNICIPALITY (CASA DEL ESTUDIANTE, COL. PARAÍSO STAGE 2, COL. GUERRERO STAGE 2, EJIDO SAN LUCAS ZONE I AND II, TOWN SAN BRUNO ZONE I AND II, MARINE ZONE, BAHÍA ASUNCIÓN , SAN LUCIANO, VILLA ALBERTO, ALVARADO A. AND SANTA ROSALÍA). A TOTAL OF 97 12M WOODEN POLES, 36 TRANSFORMERS AND 4KM OF CONDUCTOR WERE INSTALLED TO SUPPLY ENERGY TO HOMES IN THE AREA.

Continue reading

  • 1
  • 2

© NEZCO. Todos los Derechos Reservados. Powered by DSEO.