WE BUILT A MEDIUM VOLTAGE LINE FOR THE MXI-5110 CIRCUIT SUBSTATION MEXICALI. A NEW OVERHEAD LINE TRUNK WAS DERIVED FROM THE SUBSTATION TO BE INTERCONNECTED TO THE CITY NETWORK, WHICH CONSISTED OF 28 POSTS AND 3 KM OF CONDUCTOR TO FORM PART OF THE 5110 CIRCUIT OF SAID SUBSTATION.