15 June, 2022

LORETO RECALIBRATION

15 June, 2022

PLACE: LORETO, BCS.

WE CONDUCTED THE CONSTRUCTION OF THE OVERHEAD LINE AND RECALIBRATION OF THE EXISTING LINE OF THE LORETO SUBSTATION FOR THE 4135 AND 4155 CIRCUIT.

THE NEED ARISEN TO IMPROVE TWO CIRCUITS OF THE SUBSTATION, FOR THIS WE PERFORMED THE RECALIBRATION OF TWO CIRCUITS OF THE SAME PATH. NEW POLES WERE INSERTED AND EXISTING ONES WERE RESTRUCTURED TO INSTALL 24KM OF NEW CONDUCTOR IN A DOUBLE CIRCUIT NETWORK TO COMBAT LOSSES AT THE SUBSTATION.

Nezco
[DISPLAY_ULTIMATE_SOCIAL_ICONS]

© NEZCO. Todos los Derechos Reservados. Powered by DSEO.