17 June, 2022

PRADERAS DEL MAR

17 June, 2022

PLACE: ROSARITO, BC.

IT CONSISTED OF A PROJECT FROM SCRATCH, WHERE WE ANALYZED, DESIGNED AND INSTALLED THE ELECTRICAL NETWORK ACCORDING TO THE NEEDS OF THE FRACTIONATION, IN THE SAME WAY WE CARRY OUT THE MANAGEMENT OF THE PROCESS WITH CFE FOR THE SUPPLY OF ENERGY, SUPERVISING THE PROCESS FROM THE BEGINNING TO THE CONNECTION BY THE FEDERAL ELECTRICITY COMMISSION.

Nezco
[DISPLAY_ULTIMATE_SOCIAL_ICONS]

© NEZCO. Todos los Derechos Reservados. Powered by DSEO.