15 June, 2022

VIZCAINO LINE

15 June, 2022

PLACE: VIZCAINO, BCS.
WE BUILT THE ELECTRICAL NETWORK FOR THE SAN JUAN PROPERTY IN THE CITY OF VIZCAÍNO. WE INSTALLED 40 WOODEN POLES OF 12M, 9 TRANSFORMERS AND 5KM OF CONDUCTOR TO SUPPLY ENERGY TO THE HOUSES OF THE SITE.

Nezco

SERVICES

  • Maintenance
  • Industrial buildings
  • Hotels and Restaurants
  • Optical Fiber
  • Generation and Storage
  • Distribution lines air
  • Distribution lines underground
  • Energy saving
  • Network code

Follow us

© NEZCO. All Rights Reserved. Powered by DSEO.

en_USEnglish