15 June, 2022

MEXICALI LINE

15 June, 2022

PLACE: MEXICALI, BC.

WE BUILT A MEDIUM VOLTAGE LINE FOR THE MXI-5110 CIRCUIT SUBSTATION MEXICALI. A NEW OVERHEAD LINE TRUNK WAS DERIVED FROM THE SUBSTATION TO BE INTERCONNECTED TO THE CITY NETWORK, WHICH CONSISTED OF 28 POSTS AND 3 KM OF CONDUCTOR TO FORM PART OF THE 5110 CIRCUIT OF SAID SUBSTATION.

Nezco

SERVICES

  • Maintenance
  • Industrial buildings
  • Hotels and Restaurants
  • Optical Fiber
  • Generation and Storage
  • Distribution lines air
  • Distribution lines underground
  • Energy saving
  • Network code

Follow us

© NEZCO. All Rights Reserved. Powered by DSEO.

en_USEnglish