MEXICALI LINE AND SUBSTATION

15 June, 2022

PLACE: MEXICALI, BC.

WE BUILT A MEDIUM VOLTAGE LINE FOR THE MXI-5110 CIRCUIT AT THE MEXICALI SUBSTATION. A NEW OVERHEAD LINE TRUNK WAS DERIVED FROM THE SUBSTATION TO INTERCONNECT TO THE CITY NETWORK, WHICH CONSISTED OF 28 POSTS AND 3 KM OF CONDUCTOR TO BE PART OF CIRCUIT 5110 OF SAID SUBSTATION.