15 June, 2022

LA BALLENA

15 June, 2022

PLACE: SAN JOSÉ DEL CABO, BCS.

WE CARRY OUT ELECTRICAL WORKS IN THE PROPERTY KNOWN AS LA BALLENA.

WE BUILT THE OVERHEAD LINE IN WHICH BETWEEN NEW AND EXISTING WORKS WERE INSTALLED MORE THAN 300 STRUCTURES ON POLES, MORE THAN 100 TRANSFORMERS AND 25KM OF CONDUCTOR TO ELECTRIFY AND REGULATE ENERGY IN THIS AREA OF SAN JOSÉ DEL CABO.

Nezco

SERVICES

  • Maintenance
  • Industrial buildings
  • Hotels and Restaurants
  • Optical Fiber
  • Generation and Storage
  • Distribution lines air
  • Distribution lines underground
  • Energy saving
  • Network code

Follow us

© NEZCO. All Rights Reserved. Powered by DSEO.

en_USEnglish