15 June, 2022

MARINE HOUSING COMPLEX

15 June, 2022

PLACE: CABO SAN LUCAS, BCS.

WE CARRIED OUT THE CONSTRUCTION OF AN OVERHEAD AND UNDERGROUND LINE FOR ELECTRICAL SUPPLY TO THE ‘MARINOS’ HOUSING COMPLEX (WHICH FUNCTIONS AS THE NATIONAL GUARD CAMP IN LOS CABOS). THERE WERE 13 KM OF OVERHEAD LINE MADE UP OF MORE THAN 190 POLES + 500 M OF UNDERGROUND LINE.

Nezco

SERVICES

  • Maintenance
  • Industrial buildings
  • Hotels and Restaurants
  • Optical Fiber
  • Generation and Storage
  • Distribution lines air
  • Distribution lines underground
  • Energy saving
  • Network code

Follow us

© NEZCO. All Rights Reserved. Powered by DSEO.

en_USEnglish